Other Info

Schedule

From March 5-15, I will begin filming. By then, I hope to already have all the equipment I need for at least the first 80 seconds of the title sequence. Anytime during this weekend or within the next 7-10 days I will shoot all of the scenes that are inside of my home. One benefit of filming inside is that I can film at virtually any time.

From March 16-21 I expect to have all of the outdoor scenes. I will continue repeating to get the best result.

From the 21 to the 28 I will have hoped to finish the first round of everything. From here to 4/13, I will give this to a family member to review. Afterwards, I will review the sequence and make any finishing touches.


Location

The beginning of the sequence will most likely take place in my own house. I plan to ha some scenes take place in my bedroom by a desk. Additionally, I would be moving throughout the house and through a hallway into a kitchen. For the concluding scenes, I plan to move outdoors to a more scenic landscape. Attached are the main areas in my room where I will be filming.




Participants

Actors -     Alec Zamudio - Writer

Filming -     Alec Zamudio

Editing -     Alec Zamudio

Directing -     Alec Zamudio

Health and Safety

Although none of the scenes present any possible risk of injury, I have made some precautions. To ensure my safety, I have a first aid kit on standby. This is equipped with bandages and alcohol wipes. In case of a more sever emergency, I have my phone on standby to call emergency services.

Backup Plan

In case of an emergency, I can film in my dining room. It has a table, but it is in a high traffic area. However, I can try filming during night with less interruptions and use artificial lights. 

Comments

Popular posts from this blog

Production and Transportation

Planning: Storyboard

Recurring Issues